Here's another shot of the register.
Back to Home Page.
Praise The Lord For Answered Prayers!
Latest Events Info.
Our Sheperd And Family.
Pastor David's Web Message.
Contact Us.
Mission Statement.
2012 Calendar of Events.
History of Louisa Chapel.
Ministries.
Missions.
Louisa's Youth and Kids Activities.
Pictures From Louisa Chapel.
100th Year Celebration
New Members to Louisa Chapel
VBS 2010
Vacation Bible School 2011
Second Chance Christmas
Pictures from Louisa Chapel.
Front Porch Project
Various Pictures From Louisa Chapel.
Pictures From Picnic At Bud and Ann Green's, 2009.
2010 Picnic and Hayride at Bud and Ann's
Standing Indian Outings
Men's and Women's Ministry Pictures.
Landscaping/Church Projects
Mission Project Pictures
Trunk ot Treat at Church and the Park.
2009 Christmas Play
Souper Bowl 2011
The photographer held his camera a wee bit crocked but the doors were installed plumb.
Here's a shot ot the doors from inside. They were purchased in memory of Audrey's mother. They are BEAUTIFUL!
We are currently installing a geothermal heating system
in the Church.
Work commenced April 11, 2011.
Here's a few shots of what it looked like prior to
starting the project.

Scroll down to see progress.
Pregnancy Care Center
CareNet
Special Olympics
Relay For Life
Our latest Church project, geothermal heating.
The Gideons
Rathbun Center
Cartoogechaye Elementary School
Shriner's
TBA
TBA
TBA
There was a beautiful rainbow in the sky this morning.
=================================================================================================================================================================================================================
These doors were donated by
Audrey Ledbetter in honor of
her Mother. They are as
BEAUTIFUL as she was a
person.
Thank you Audrey
Getting ready to raise the drilling rig for the sixth and final hole.
A shot of one of the well heads.
Moving the dirt around so the water will drain out of the mesh.
Digging into the pile of dirt.
Bruce doing some cleaning up of the slurry from drilling and loading it onto the dump trailer.
===================================================================================================================================
April 13, 2011 they started drilling hole #6 the final hole.
 The upstairs closet in Marlene's classroom will become the trunkline for the system.
There will be 6 holes drilled for the system
Two holes were drilled the first day.
The soil as it's being blown away from the drilling machine.
Ozzie is keeping close track of them as they drill hole number 3.
This is where the current heating system is located.
These three pictures of room will begin looking differently before long.
The kids and adults Sunday School classrooms will be having a major changeover.
===================================================================================================================================
A shot of the new unit in it's final resting place.
July 17, 2011
If I'm not mistaken, the unit is completely installed awaiting the
electrical and well hookup which will be completed shortly.
These pictures were
taken April 12, 2011
when drilling started.
===================================================================================================================================
===================================================================================================================================
This picture shows the six holes/wells that were drilled into the parking lot.
April 17, 2011 shows all holes complete and filled ready to be connected.
===================================================================================================================================
May 15, 2011
The unit has been delivered and the interior is undergoing some demolition for easier access to electrical. There has also been
an access stairway installed to the attic area upstairs. All exterior plumbing has been connected and run to the outside wall.
This is a shot of the access stairway installed to the attic.
Another shot of ceiling tile removed.
Ceilings have been removed, unit set in temporary position, and duct laying around.
Holes all dug and pipes all connected and trenches backfilled.
The picture to
the right is what
 the upstairs
closet looks like
now!
A shot of the unit following all electrical and plumbing hookup. LOOKS GOOD!
=================================================================================================================================================================================================================
August 5, 2011
The geothermal unit is fully
functional as of today.
Here's a shot.
=================================================================================================================================================================================================================
Today, 8/16/2011, the wall that will separate the furnace
room from the adjoining classroom was completed.
=================================================================================================================================================================================================================
Picture taken from kitchen area.
Same room but from the Classroom end.
This shot is taken from the new wall toward the Fellowship Hall.
Looking toward the new wall, hopefully someone will get this completed so it can be painted. Wonder who needs to get this done.
The ceilings have been completed in both the Classrooms and kitchen area. Looks pretty good don't ya think?
=================================================================================================================================================================================================================
August 23, 2011
Work was completed in the Classroom. It has
been painted and new baseboard put down.
LOOKS GREAT DONNIE AND GEORGE!
The Fellowship Class sponsored a lunch following the Church Service,
September 11 2011, proceeds went to the Building Fund. There was
$2713.00 raised. A special THANKS to all who attended and gave.
=================================================================================================================================================================================================================
September 19, 2011
Work was started in the Sanctuary,
getting ready for the new carpeting. Floor
registers need removal and hole filled.
Now this one, as you can see by the sides bent in, we kinda tore apart to see what we had to do to place flooring in these spots.
This is what the one cold air return looked like prior to us doing anything.
Here's one after we finished.
Yup! You guessed it, this is the other one.
=================================================================================================================================================================================================================
October 4th and 5th, 2011
Work continues. The registers have all been removed and covered.
These areas require additional work as the floors surrounding need
to be leveled so they don't show through the new carpeting.
October 4th and 5th, 2011
Work continues. The registers have all been removed and covered.
These areas require additional work as the floors surrounding need
to be leveled so they don't show through the new carpeting.
=================================================================================================================================================================================================================
=================================================================================================================================================================================================================
October 9, 2011
Here's a shot of the Sanctuary with the new carpeting installed.
There is still carpeting to be installed in the wings, hallways,
Classrooms, and Pastor's Office. It's looking good.
=================================================================================================================================================================================================================
October 11, 2011
I failed to post this picture of Pastor Preaching in the Fellowship Hall, Sunday morning.
=================================================================================================================================================================================================================
October 12, 2011
Here's a few shots of their progress with the carpeting. Come see it for yourself.
This is taken from the first Classroom toward the door leading to the basement.
This is taken from the same area but looking toward Pastors Office and the Nursery.
Here's a shot of the hallway from the Sanctuary to the Classrooms, restrooms, and Pastors Office.
Here one can see the seam that will be completed. There also is part of the Choir loft that has carpeting.
The Sanctuary it's self appears to be done, although the overflow rooms and Sanctuary seams are not.
=================================================================================================================================================================================================================
October 12, 2011
When I went to Bible Study tonight, I checked back to see what progress had been made during the day.
As the pictures reveal, there was even more progress made during Bible Study. Matter of fact, they were
heading back to the store to get another roll of carpeting. I understand they are planning on being done Friday.
The Choir Loft now has the new carpeting in place, granted it isn't fully installed but it's laying there.
Looks MIGHTY fine from the back of the Sanctuary.
The area in front of these doors is without carpeting when I took pictures before Bible Study.
Marlenes Classroom has had the old carpeting removed, well most of it.
Hallways are now fully covered with new carpeting.
The Nursery still has the old carpeting.
Pastors Office still has the old carpeting. Looks as if it is somewhat of a storage room also.
Now the area in front of the doors has carpeting which it didn't have earlier.

I'm pretty sure
there will likely
be a MAJOR
cleanup day
scheduled for
Saturday.
Call for details.
=================================================================================================================================================================================================================
October 14, 2011
I was over to the Church around 11:00 this morning and it is appearing as
if the carpeting will indeed be installed today.
Now we'll hope many will show up tomorrow to do the required cleaning.
=================================================================================================================================================================================================================
Saturday, October 15, 2011
There was a very good turn out today for cleaning the Sanctuary, Classrooms, and Pastors Office.
I won't begin to name names but I believe there were between 10-12 folks helping.
You'll see we had some rather unlikely assistance.
Busy, busy, busy.
As you can see, things were bustling.
Dave Maynard did a LOT of sweeping. I will mention his name. Thanks Dave!
Now here, things had turned into Government work, two working and everyone else watching.
You can see I wasn't
working, just taking
pictures.
Thanks EVERYONE for
your help!